The Uttar Pradesh Occupational Safety, Health and Working Conditions Rules, 2026
Schedule XXXIII specified under Rule 125}
Official text
Open in the official PDF (pp. 544–545)
Tables and forms lose their layout when extracted; the PDF is the authoritative version.
Report of Examination and Test of Dust Extraction of Suppression System
1. Description of system
2. Hood-
(a) Serial number of hood
(b) Contaminant captured
(c) Capture Velocities (at points to be specified)
Design Value Actual Value
(d) Volume exhausted at hood
(e) Hood Static Pressure
3. Total Pressure drop at--
(a) Joints
(b) Other points of system (to be specified)
4. Transport velocity in duct at points along ducts (to be specified)
5. Air cleaning device--
(a) Type used ... ... ...
(b) Velocity at inlet ... ... ...
(c) Static pressure at inlet ... ... ...
(d) Velocity at outlet ... ... ...
(e) Static Pressure at outlet ... ... ...
6. Fan--
(a) Type used ... ... ...
(b) Volume handled ... ... ...
(c) Static Pressure ... ... ...
(d) Pressure drop at outlet of fan ... ... ...
7. Fan Motor-
(a) Type ... ... ...
(b) Speed and power in kilowatts ... ... ...
8. Particulars of defects, if any, disclosed during test of any of the above components.
I certify that on (date ........................) the above dust extraction system was
thoroughly cleaned and(so far as its construction permits) made available for thorough
examination. I further certify thaton the said date, I thoroughly examined the above dust
extraction system including itscomponents and fittings and that the above is a true report of my
examination.
Signature .....................
Qualification .................
Address ………………
Date…………………..
(If employed by a company or association, name and address of the company or association)