The Occupational Safety, Health and Working Conditions (Andhra Pradesh) Rules, 2026
Form XXX
Official text
Open in the official PDF (pp. 491–492)
Tables and forms lose their layout when extracted; the PDF is the authoritative version.
[See Rule 162]
CERTIFICATE OF STABILITY
1. Name of the factory....................................................
2. Village, town and district in which the factory is
situated....................................................
3. Full postal address of the
factory....................................................
4. Name of the occupier of the
factory....................................................
5. Name of manufacturing process to be carried on in the
factory............................
6. Number of floors on which workers will be
employed............................
7. Material of construction. Walls, roof, etc.
8. Number of buildings/structures, give details:
(a) Constructed area on the ground floor
(b) Total Constructed area and height of each floor
9. Tests were applied:
(a) Rebound Hammer test
(b) Ultrasonic pulse velocity test
(c) any other tests; namely ....................................................
10. Details of examination of steel structures and sheet roofing:
(a) High raised chimney: state if it is self-supported or tied by
tensioning ropes; are the tensioning ropes/ foundation fastening
safe and in good condition?
(b) Observation regarding steel structures, if any:
(c) Observation regarding the stability of sheet roofing; if provided:
11. Defects/ requirement of repair if any:
This is certified that I have inspected the building/buildings, the plans of
which have been approved by the Chief Inspector cum facilitator in his
letter No.............. dated............ and examined the various parts,
including the foundations with special reference to the machine, plant,
etc., that have been installed. I am of the opinion that the
building/buildings which has/have been
constructed/reconstructed/extended/taken into use is/are in accordance
with the plans approved by the Chief Inspector in his letter mentioned
above, that it/they is/are structurally sound and that its/their stability will
not been endangered by its/their use as a factory/part of a factory for the
manufacture of........... for which the machinery, plant, etc. installed are
intended.
Signature...............................................
Qualification...........................................
Address.................................................
Date.....................................................
Certification No........ date................. of competency issued by Chief
Inspector cum facilitator. If employed by a company or an association,
the name and address of the company or association.