PROCESS OF EXTRACTING OILS AND FATS INSOLVENT EXTRACTION
PLANTS
1. Definitions
(a) "Competent Person " is a Graduate in Mechanical Engineering or Chemical
Technology with specialized knowledge of Oils and Fats and with a
minimum experience of five years in a solvent extraction plant shall be
considered to be a competent person:
Provided further that the State Government may accept any other
qualifications, if in its opinion, they are equivalent to the qualifications
afore said;
(b) “Flame-proof enclosure as applied to electrical machinery or apparatus
means an enclosure that will withstand, when covers or other access doors
are properly secured, an internal explosion of the inflammable gas or
vapour which may enter or which may originate inside the enclosure
without suffering damage and without communicating the internal
inflammation(or explosion)to the external flammable gas or vapour.
(c) "Solvent " means an inflammable liquid such as Pentane and Hexane and
Heptane used for the extraction of vegetable oils;
(d) “Solvent Extraction Plant ", means a plant in which the process of
extracting oils and fats by the use of solvents is carried on.
2. Location and layout
(a) No solvent extraction plant shall be permitted to be constructed or
extended within a distance of thirty meters from the nearest residential
locality.
(b) A continuous wire fencing shall be provided around the solvent extraction
plant up to a minimum distance of 15 meters from the plant and the
fencing so provided shall be not less than 1.5 meters in height.
(c) No person shall be allowed to carry any matches or an open flame or fire
inside the area bound by the fencing.
(d) Boiler houses and other buildings where open flame processes are carried
on shall be located at least thirty meters away from the solvent extraction
plant.
(e) If godowns and preparatory processes are within a distance of thirty
meters from the solvent extraction plant, these shall be atleast fifteen
meters distance from the plant, and a continuous barrier wall of non-
combustible material of a height of 1.5 meters from ground level shall be
erected at a distance of not less than fifteen meters from the solvent
extraction plant so that it extends to at least thirty meters of vapour travel
around its ends from the plant to the possible sources of ignition.
3. Electrical Installation
(a) All electrical motors, electrical wiring system, the electric lamps, switches,
circuit breakers and all other electrical equipment used within the premises
of a factory where extraction of oil is being carried on with the help of
solvents shall be of flame proof construction and should be suitable for use
in areas where Hexane or similar types of solvents or vapors are likely to
exist.
(b) All metal parts of the plant and building including various tanks and
containers where solvents are stored or are likely to be present and all
parts of electrical equipment’s not required to be energized shall be
properly connected to earth so as to avoid accidental rise in the electrical
potential of such parts above the earth potential.
4. Restriction on smoking: Smoking shall be strictly prohibited within a
distance of 15 meters from the solvent extraction plant. For this purpose,
'No Smoking' signs shall be permanently displayed in the area.
5. Precautions against friction
(a) All tools and equipment including ladders, chains and other lifting tackle
required to be used in the solvent extraction plant shall be of non-sparking
type;
(b) No machinery or equipment in any solvent extraction plant shall be belt
driven unless the belt used is of such a type that it does not permit
accumulation of static electricity to a dangerous level;
(c) No person shall be allowed to enter and work in the solvent extraction
plant wearing clothes made of nylon or such other fiber that can generate
static electrical charge or wear footwear which is likely to cause sparks by
friction.
6. Fire-fighting apparatus
(a) An adequate number of portable fire extinguishers suitable for use against
flammable liquid fire shall be provided in the solvent extraction plant;
(b) An automatic water spray sprinkler system on a wet pipe or open head
deluge system with a sufficient supply of storage water shall be provided
over the solvent extraction plant and throughout the building housing such
plant.
7. Precautions against power failure
Provision shall be made for the automatic cutting off of steam in the event
of power failure and also for emergency overhead water supply for feeding
water by gravity to condensers which shall come into play automatically
upon a power failure.
8. Magnetic separators
Oil-cake shall be fed to the extractor by a conveyor through a hopper and
a magnetic separator shall be provided to remove any piece of iron during
its transfer.
9. Venting
(a) Tanks containing solvents shall be protected with emergency venting to
relieve excessive internal pressure in the event of fire.
(b) All emergency relief vents shall terminate at least six meters above the
ground and be so located that the vapors will not re-enter the building in
which the solvent extraction plant is located.
10. Waste-water
Process waste water shall be passed through a flash evaporator to remove
any solvent before it is discharged into a sump which should be located
within the fenced area but should not be closer than eight meters to the
fence.
11. Ventilation
The solvent extraction plant shall be well ventilated and if the plant is
housed in a building, the building shall be provided with mechanical
ventilation with provision for at least six air changes per hour.
12. House-keeping
(a) Solvent shall not be stored in an area covered by the solvent extraction
plant except in small quantities which shall be stored in approved safety
cans;
(b) Waste materials such as oily rags, other wastes and absorbents used to
wipe off solvent and paints and oils shall be deposited in approved
containers and removed from the premises at least once a day ;
(c) Space with the solvent extraction plant and within15 meters from the plant
shall be kept free from any combustible materials and any spills of oils or
solvent shall be cleaned up immediately.
13. Examination and repairs
(a) The solvent extraction plant shall be examined by the competent person to
determine any weakness or corrosion and wear once in every 12 months.
Report of such examination shall be supplied to the Inspector-cum-
Facilitator with his observation as to whether or not the plant is in safe
condition to work ,
(b) No repairs shall be carried out to the machinery or plant except under the
direct supervision of the competent person.
(c) Facility shall be provided for purging the plant with inert gas or steam
before opening for cleaning or repairs and before introducing solvent after
repairs.
14. Operating personnel
The operation of the plant and machinery in the solvent extraction plant
shall be in the charge of such duly qualified and trained persons as are
certified by the competent person to be fit for the purpose and no other
person shall be allowed to operate the plant and machinery.
15. Vapour detection
A suitable type of flame- proof and portable combustible gas indicator shall
be provided and maintained in good working order and a schedule of
routine sampling of atmosphere at various locations as approved by the
Chief Inspector-cum-Facilitator shall be drawn out and entered in a register
maintained for the purpose.