The Occupational Safety, Health and Working Conditions (Andhra Pradesh) Rules, 2026
Form XXIII
Official text
Open in the official PDF (pp. 481–482)
Tables and forms lose their layout when extracted; the PDF is the authoritative version.
(See rule – 117 (2))
APPLICATION FOR APPROVAL OF PLANS OF FACTORY
Hazardous Nature of Factory: Hazardous/Non-Hazardous
1) Plan Type: New / Extension/Revision History
2) Name of the Factory:
3) Full Address and location of the site/factory:
4 a) Communication Address:
b) Email Address:
5) Number of employees to be employed: Men: Women:
6) Installed horsepower: Regular: HP Standby power:
KVA
7) List of plant and machinery (Upload):
8) Raw Materials used and maximum Quantities stored in the
Manufacturing (Upload):
9) Brief Description of Manufacturing Process: (Upload)
10) Final Products and their output capacities: Upload
11) Type and Nature of wastes and effluents, their quantities and
Methods of their disposal :( Upload)
12) In case of extensions or additional installation, reference numbers
of plans approved earlier:
Sl.NO New / Revision Approved letter
number
13) Type of industry: Hazardous / non-hazardous
14) Signature of Occupier with name & designation :( Upload)
Signature of Occupier
Enclosures for Plan approval:
a) Registered Sale Deed / Lease Deed:(Upload)
b) Site Plan :( Upload)
c) Detailed Building Plan :( Upload)
d) Partnership Deed / Memorandum of Articles of Association :(
Upload)
e) Process Flow Chart :( Upload)
f) Copy of PAN Card / Aadhar Card of applicant :( Upload)
g) MSDS of chemical
h) Appropriate Risk assessment reports,
i) Operability Study.
j) Arrangements proposed for effective removal of dust, fumes,
gases and disposal of trade wastes and effluents etc.
k) List of Director/Partner