The Occupational Safety, Health and Working Conditions (Lakshadweep) Rules, 2025
Schedule XXIX
Official text
Open in the official PDF (pp. 174–177)
Tables and forms lose their layout when extracted; the PDF is the authoritative version.
PROCESS OF MELTING IN INDUCTION FURNACE
1. Application: Provisions of this schedule shall apply to all parts of factories operations
where melting of metal is done in induction furnace and other allied processes are carried on.
2. Definitions:
(1) "Induction Furnace" means furnace in which a strong magnetic field created by passing
an electric current through a coil wrapped around thefurnace. The magnetic field in turn creates
a voltage across, and subsequently an electric current through, the metal to be melted.
(2) "Coil" means coil of Induction Furnace
(3) "Ladle" means equipment used to carry melted metal
(4) "Mould" means moulds made of steel, sand, loam, moulding composition or other
mixture of materials.
(5) ·'Personal Protective Equipment" Personal Protective Equipment (PPEs)refers to protective
clothing, helmets, goggles, or other garments or equipment designed to protect the wearer's
body from injury or infection.
(6) "Refractory" means lining of refractory bricks made in pit
3. Arrangement and storage - For the purposes of promoting safety and cleanliness in
workrooms the following requirements shall be observed: -
(a) moulding boxes, loam plates, ladles, patterns, pattern plates, frames, boards, box
weights, and other heavy articles shall be so arranged and placed as to enable work to be carried
on without unnecessary risk:
(b) Suitable and conveniently accessible racks, bins, or other receptacles shall be provided
and used for the storage of other gear and tools;
(c) Where there is bulk storage of sand, fuel, metal scrap or other materials or residues,
suitable bins, bunkers or other receptacles shall be provided for the purpose of such storage.
4. Construction, maintenance of platform and floors -
(1) The platform of furnace should be of good construction, sound material and adequate
strength to withstand explosion
(2) The platform must be of adequate size to accommodate persons working there and raw
material to be charged
(3) The platform must be provided with at least two stairs
(4) Floors of indoor workplaces in which the processes are carried on, other than parts
which are of sand, shall have been surface of hard material.
(5) No part of the floor of any such indoor workplace shall be of sand except where this is
necessary by reason of the work done.
(6) All parts of the surface of the floor of any such indoor workplace which are of sand shall,
so far as practicable, be maintained in an even andfirm condition.
5. Authorised person : - (1) No person except those authorised to work on platform or near
furnace shall be allowed on the platform or near furnace.
(2) Person covered under exception of sub-rule (1) must be trained and provided with
prescribed personnel protective equipments.
(3) No person shall carry out any work within a distance of 4 metres from a vertical line
passing through the delivery end of any spout of a furnace, being a spout used for delivering
molten metal, or within a distance of 2.4 metres from a vertical line passing through the nearest
part of any ladle which is in position at the end of such a spout, except, in either case, where it
is necessary for the proper use of maintenance of furnace that work should be carried out within
that distance of that work is being carried out at such a time and under such conditions that
there is no danger to the person carrying it out from molten metal which is being obtained from
the cupola or furnace or is in a ladle in position at the end of the spout.
6. Maintenance and examination of exhaust plant -
(1) All ventilation plant used for the purpose of extracting, suppressing or controlling dust
or fumes shall be properly maintained.
(2) All ventilating plant used for the purpose of extracting, suppressing or
controlling dust or fumes shall be examined and inspected once every week by a responsible
person. It shall be thoroughly examined and tested by a competent person at least once in every
such examination and test shall be entered in a register in Form-42 electronically or otherwise
which shall be available for inspection by an Inspector-cum-Facilitator. Any defect found on
any such examination and carrying out the examination and test to the occupier of the factory.
7. Ladle
(1) Before the ladle is placed for pouring the hot liquid metal, it shall be thoroughly
inspected
(2) Place the ladle below the spout.
(3) Before pouring is started, it shall be ensured that:
(a) Only minimum required nos. of persons shall be present.
(b) They all shall use PPEs like face shield, flame retardant suit, anklets, goggles,
hand gloves. helmets and safety shoes.
(4) Ladle shall be removed only after clearance from the Furnace ln-charge.
(5) Ladle shall not be transported in tilted condition.
8. Operation and Maintenance of furnace:
(1) The occupier shall operate the furnace as per instructions supplied by manufacturer.
(2) The occupier shall keep the maintenance of furnace as per maintenance schedule
supplied by manufacturer.
(3) The coil should be checked at regular intervals
(4) The refractories shall be changed at regular interval
9. Work Permit
The occupier shall issue work permit to the person supposed to work in confined space, at
height or on electric equipment’s.
10. Washing facilities -
The occupier shall provide and maintain, in a clean state and in good repair for the use of all
persons employed a wash place under cover with sufficient supply of water and soap, towel
etc.
11. Protective equipment -
The occupier shall provide and maintain suitable PPEs for all persons employed in process as
specified in sub-rule (2).
12. Prohibition of employment of pregnant Woman and Adolescent - No pregnant woman
or adolescent shall be employed in any of the process covered by this schedule
13. Medical examination by medical officer - (1) every worker employed in the processes
specified in paragraph 1 shall be examined by a Medical officer within 15 days of his first
employment. Such examinations shall include skin test, Audiometric test, Pulmonary test and
no worker shall be allowed to work after 15 days of his first employment in the factory unless
certified fit for such employment by the Medical officer.
(2) Every worker employed in a manganese process shall be re-examined by a Medical officer
at least once in every 12 months and such examination shall, wherever the Medical officer
considers appropriate, include all the tests in subparagraph (1).
(3) The Medical officer after examining a worker, shall issue a Certificate of Fitness in
Form-40. The record of examination and re-examinations carried out shall be entered in the
Certificate and the Certificate shall be kept in the custody of the occupier of the factory. The
record of each examination carried out under sub-paragraph (1) and (2) including the nature
and the results of these test, shall also be entered by the Medical officer in a health register in
Form-41 electronically or otherwise.
(4) The Certificate of Fitness and the health register shall be kept readily available for
inspection by the Inspector-cum-Facilitator.
(5) If at any time the Medical officer is of the opinion that a worker is no longer fit for
employment in the said processes on the ground that continuance therein would involve special
danger to the health of the worker, he shall make a record of his findings in the said certificate
and the health register. The entry of his findings in those documents should also include the
period for which he considers that the said person is unfit to work in the said process shall be
provided with alternate placement facilities unless he is fully incapacitated in the opinion of
the Medical officer. in which case the person affected shall be suitably rehabilitated.
(6) No person who has been found unfit to work as said in sub-paragraph (5) shall be re-
employed or permitted to work in the said processes unless the Medical officer, after further
examination, again certifies him fit for employment in those processes.
14. Exemptions - lf in respect of any factory, the Chief Inspector-cum-Facilitator is satisfied
that owing to the exceptional circumstances or infrequency of the processes or for any other
reason, all or any of the provisions of this schedule is not necessary for the protection of the
workers in the factory, the Chief Inspector-cum-Facilitator may be a certificate in writing which
he may in his discretion revoke at any time, exempt such factory from all or any of such
provisions subject to such conditions, if any, as he may specify therein.