The Occupational Safety, Health and Working Conditions (Lakshadweep) Rules, 2025
Schedule XI
Official text
Open in the official PDF (pp. 78–96)
Tables and forms lose their layout when extracted; the PDF is the authoritative version.
CHEMICAL WORKS
PART-I
1. Application - This schedule shall apply to all manufacture and processes incidental
there to carried on in chemical works.
2. Definitions - For the purpose of this schedule -
(a) "chemical works" means any factory or such parts of any factory as are listed in
appendix· A' to this schedule;
(b) "efficient exhaust draught" means localised ventilation effected by mechanical or other
means for the removal of gas, vapour, fume or dust to prevent it from escaping into the air of
any place in which work is carried on;
(c) "bleaching powder” means the bleaching powder commonly called
(d) chloride of lime;
(e) "chlorate" means chlorate or per chlorate;
(f) "caustic" means hydroxide of potassium or sodium;
(g) "chrome process" means the manufacture of chromate or dichromate of potassium or
sodium, OT the manipulation, movement or other treatment of these substances;
(h) "nitro or amino process" means the manufacture of nitro or amino derivatives of phenol
and of benzene or its homologues, and the making of explosives with the use of any of these
substances;
(i) the term 'permit to work' system means the compliance with the
(j) procedures laid down under Para 20 of Part II;
(k) "toxic substances" means all those substances which when they enter into the human
body, through inhalation or ingestion or absorption through skin, in sufficient quantities cause
fatality or exert serious affliction of health, or chronic harmful effects on the health of persons
exposed to it due to its inherent chemical or biological effects. In respect of substances whose
TLV is specified in Rule-131exceeding the concentration specified therein would make the
substance toxic;
(1) "emergency" means a situation or condition leading to a circumstance or set of
circumstances in which there is danger to the life or health of persons or which could result in
big fire or explosion or pollution to the work and outside environment, affecting the workers
or neighbourhood in a serious manner, demanding immediate action;
(m) "dangerous chemical reactions" means high speed reactions, runaway reactions, delayed
reactions, etc. And are characterised by evolution of large quantities of heat, intense release of
toxic or flammable gases or vapours, sudden pressure build-up etc.;
(n) "manipulation" means mixing, blending, filling, emptying, grinding,
(o) sieving, drying, packing, sweeping, handling, using, etc.;
(p) "approved personal protective equipment" means items of personal protective equipment
conforming to the relevant ISI specifications or in the absence of it, personal protective
equipment approved by the Inspector- cum-Facilitator;
(q) "appropriate personal protective equipment" means that when the protective equipment is
used by the worker, he shall have no risk to his life or health or body; and
® "confined space" means any space by reason of its construction as well as in relation to the
nature of the work carried therein and where hazards to the persons entering into or working
inside exist or are likely to develop during working.
PART-II
General Requirements
Applying to all the works in Appendix 'A'
1. Housekeeping -
(1) Any spillage of materials shall be cleaned up before further processing.
(2) Floors, platforms, stairways, passages and gangways shall be free of any obstructions.
(3) There shall be provided easy means of access to all parts of the parts of the plant to facilitate
cleaning.
2. Improper use of chemicals-No chemicals or solvents or empty containers containing
chemicals or solvents shall be permitted to be used by workers for any purpose other than in
the processes for which they are supplied.
3. Prohibition on the use of food to be specified clearly - No food, drink, tobacco, pan or
any edible item shall be stored or heated or consumed on or near any part of the plant or
equipment.
4. Cautionary Notices and Instructions -
(1) Cautionary notices in a language understood by the majority of workers shall be
prominently displayed in all hazardous areas drawing the attention of all workers about the
hazards to health, hazards involving fire and explosion and any other hazard such as
consequences of testing of material or substances used in the process or using any contaminated
container for drinking or eating, to which the workers' attention should be drawn for ensuring
their safety and health.
(2) In addition to the above cautionary notice, arrangement shall be made to instruct and
educate all the workers including illiterate workers about the hazards in the process including
the specific hazards to which they may be exposed to, in the normal course of their work. Such
instructions and education should also deal with the hazards involved in unauthorised and
unsafe practices including the properties of substances used in the process under normal
conditions as well as abnormal conditions and the precautions to be observed against each and
every hazard. Further, an undertaking from the workers shall be obtained within one month of
their employment to the effect that they have read the contents of the cautionary notices and
instructions, understood them and would abide by them. The training and instructions to all
workers and all supervisory personnel shall include the significance of different types of
symbols and colours used on the labels stuck or painted on the various types of containers and
pipe lines.
5. Evaluation and provision of safeguards before the commencement of process -
(1) Before commencing any process or any experimental work, or any new manufacture
covered under Appendix 'A', the occupier shall take all possible steps to ascertain definitely all
the hazards involved both from the actual operations and the chemical reactions including the
dangerous chemical reactions. The properties of the raw materials used, the final products to
be made and any by-products derived during manufacture, shall be carefully studied and
provisions shall be made for dealing with any hazards including effects on workers, which may
occur during manufacture.
(2) Information in writing giving details of the process, its hazards and the steps taken or
proposed to be taken from the design stage to disposal stage for ensuring the safety as in sub-
paragraph (1) should be sent to the Chief Inspector-cum-Facilitator at the earliest but in no case
less than 15 days before commencing manufacture, handling, or storage of any of items covered
under Appendix 'A', whether on experimental basis, or as pilot plant or as trial production, or
as large scale manufacture.
(3) The design, construction, installation, operation, maintenance and disposal of the
buildings, plant and facilities shall take into consideration effective safeguards against all the
safety and health hazards so evaluated.
(4) The requirements under the sub-Paragraphs (1) (2) and (3) shall not act in lieu of or in
derogation to, any other provisions contained in any Act governing the work.
6. Authorized entry - Authorized persons only shall be permitted to enter any section of
the factory or plant where any dangerous operations or processes are being carried on or where
dangerous chemical reactions are taking place or where hazardous chemicals are stored.
7. Examination of instruments and safety devices -(1) Alt instruments and safety devices
used in the process shall be tested before taking into use and after carrying out any repair to
them and examined once in six months, by a competent person. Records of such tests and
examinations shall be maintained in a register.
(2) All instruments and safety devices used in the process shall be operated daily or as often as
it is necessary, to ensure its effective and efficient working at all times.
8. Electrical installations - All electrical installations used in the process covered in
Appendix 'A' shalt be of an appropriate type to ensure safety against the hazard prevalent in
that area such as suitability against dust, dampness, corrosion, flammability and explosively
etc. And shall confirm to the relevant ISi specifications governing their construction and use
for that area.
9. Handling and storage of chemicals -
(1) The containers for handling and storage of chemicals shall be of adequate strength
taking into consideration the hazardous nature of the contents. They shall also be provided with
adequate labelling and colour coding arrangements to enable identification of the containers
and their contents indicating the hazards and safe handling methods and shall conform to the
respective 1S1 standards. The instructions given in the label shall be strictly adhered to.
Damaged containers shall be handled only under supervision of a knowledgeable and
responsible person and spillage shall be rendered innocuous in a safe manner using appropriate
means.
(2) The arrangements for the storage of chemicals including charging of chemicals in reaction
vessels and containers shall be such as to prevent any risk of fire or explosion or formation of
toxic concentration of substances above the limits specified in these Rules.
(3) Without prejudice to the generality of the requirements in sub- Para (2) above, the
arrangements shall have suitable ventilation facilities and shall enable the maintenance of safe
levels in vessels and containers. Such arrangements shall also take into consideration, the type
of flooring and the capacity of flooring and the compatibility requirements of substances with
other chemicals stored nearby.
(4) (a) Storage of chemicals and intermediate products, which are highly unstable or
reactive or explosive shall be limited to the quantities required for two months use.
(b) Whenever the quantities laid down in the above clause (a) are to be exceeded, the
permission of the Chief Inspector-cum-Facilitator shall be obtained.
(c) Notwithstanding anything contained in clause (a) and (b) above, the Chief Inspector-
cum-Facilitator may direct any factory carrying out processes covered in Appendix 'A' to
further limit the storage of hazardous substances to quantities less than two months on
considerations of safety.
(5) Standby arrangements equal to the biggest container shall always be available to
transfer the toxic substances quickly into the standby storage facility if any defect develops in
any of the container resulting in the release of toxic substances.
(6) Any storage facility constructed using non-metallic material such as Fibre glass
Reinforced Plastics (FRP), all glass vessels etc., shall have adequate strength to withstand the
stress, if any, exerted by the contents and shall be properly anchored. Working platforms, access
ladders, pipelines etc used in such storage facility shall not have any support on the structure
of the storage facility and shall be independently supported.
10. Facility for isolation -The plant and equipment shall be so constructed and maintained
as to enable quick isolation of plant or part of plant or equipment, with appropriate indication.
One copy of the layout plan indicating the isolation facilities shall always be available with the
security personnel, the maintenance and the health and safety personnel and these isolation
facilities shall be checked for its effectiveness once in a month.
11. Personal protective equipment -
(1) All workers exposed to the hazards in the processes covered by this Schedule shall be
provided with appropriate and approved type of personal protective equipment. Such
equipment shall be in a clean, sterile and hygienic condition before issue.
(2} The occupier shall arrange to inform, educate and supervise all the workers in the use of
personal protective equipment while carrying out the job.
(3) As regards any doubt regarding the appropriateness of any personal protective equipment,
the decision of the Chief Inspector-cum-Facilitator will be final.
12. Alarm Systems -
(1) Suitable and effective alarm systems giving audible and visible indications, shall be
installed at the control room as well as in all strategic locations where process control
arrangements are available so as to enable corrective action to be taken before the operational
parameters exceed the predetermined safe levels or lead to conditions conducive for an
outbreak of fire or explosion to occur. Such alarm systems shall be checked daily and tested
every month at least once to ensure its performance efficiency at all times.
(2) The Chief Inspector-cum-Facilitator may direct such system to be installed in case of
plants or processes where toxic materials are being used and spillage or leakage of which may
cause wide spread poisoning in or around the plant.
13. Control of escape of substances into the work atmosphere -
(1) Effective arrangements such as, enclosure, or by pass, or efficient exhaust draught,
maintenance of negative pressure etc., shall be provided in all plants, containers, vessels,
sewers, drains, flues, ducts, culverts, and buried pipes and equipment, to control the escape and
spread or substances which are likely to give rise to fire or explosion or toxic hazards during
normal working and in the event of accident or emergency.
(2) In the event of the failure of the arrangements for control resulting in the escape of
substances in the work atmosphere immediate steps shall be taken to control the process in
such a manner, that further escape is brought down to the safe level.
(3) The substances that would have escaped into the work atmosphere before taking
immediate steps as required in sub-Para (2), shall be rendered innocuous by diluting with air
or water or any other suitable agent or by suitably treating the substances.
14. Control of dangerous chemical reactions - Suitable prov1s1on, such as automatic and
or remote-control arrangements, shall be made for controlling the effects of dangerous
chemical reactions. In the event of failure of control arrangements automatic flooding or
blanketing or other effective arrangements shall come into operation.
15. Testing, examination and repair of plant & equipment -
(1) All parts of plant, equipment and machinery used in the process which in the likely
event of their failure may give rise to an emergent situation shall be tested by a competent
person before commencing process and retested at an interval of two years or after carrying out
repairs to it. The competent person shall identify the parts of the plant, equipment and
machinery required to be tested as aforesaid and evolve a suitable testing procedure. In carrying
out the test mentioned above in respect of pressure vessels or reaction vessels the following
precautions shall be observed, namely -
(a) before the test is carried out, each vessel shall be thoroughly cleaned and examined
externally, and as far as practicable, internally also for surface defects, corrosion and foreign
matters. During the process of cleaning and removal of sludge, if any, all due precautions shall
be taken against fire or explosion, if such sludge is of pyrophoric nature or contains
spontaneously combustible chemicals;
(b) as soon as the test is completed, the vessel shall be thoroughly dried internally and shall
be clearly stamped with the marks and figures indicating the person by whom testing has been
done, and the date of test;
(c) and any vessel which fails to pass the test or which for any other reason is found to be
unsafe for use shall be destroyed or rendered unusable under intimation to the Chief Inspector-
cum-Facilitator.
(2) All parts of plant, equipment, machinery which is the likely event of failure may give rise
to an emergent situation shall be examined once in a month by the competent person.
(3) Records of testing and examination referred to in paragraphs (1) and (2) shall be maintained
as long as that part of the plant, equipment and machinery are in use.
(4) All repair work including alteration, modification and addition to be carried out to the plant,
equipment and machinery shalt be done under the supervision of a responsible person who
shall evolve a procedure to ensure safety and health of persons doing the work. When repairs
or modification ls done on pipelines, and joints are required to be welded, butt welding of joints
shall be preferred. Wherever necessary, the responsible person shall regulate the aforesaid work
through a 'Permit to work system'.
16. Staging –
(1) All staging that is erected for the purpose of maintenance work or repair work or for
work connected with entry into confined spaces and used in the processes included in Appendix
'A', shall be stable, rigid and constructed out of substantial material of adequate strength. Such
staging shall conform to the respective Indian Standard specifications.
(2) Staging shall not be erected over any closed or open vessel unless the vessel is so
constructed and ventilated to prevent exposure of persons working on the stages.
(3) All the staging constructed for the purpose of this Paragraph shall have appropriate
access which are safe and shall be fitted with proper hand rails to a height of one metre and toe
board.
17. Seating Arrangements - The seating arrangements provided for the operating
personnel working in processes covered in Appendix 'A' shall be located in a safe manner as to
prevent the risk of exposure to toxic, flammable and explosive substances evolved in the work
environment in the course of manufacture or repair or maintenance, either due to failure of
plant and equipment or due to the substances which are under pressure, escaping into the
atmosphere.
18. Entry into or work in confined spaces-
(a) The occupier of every factory to which the provisions of this schedule apply, shall
ensure the observance of the following precautions before permitting any person to enter or
work inside the confined spaces -
(b] identify all confined spaces and the nature of hazards that are encountered in such spaces,
normally or abnormally, and arrange to develop the most appropriate safeguards for ensuring
the safety and health of persons entering into or working inside, the confined spaces:
(c) regulate the entry or work inside the confined spaces through a 'permit to work system'
which should include the safeguards so developed as required under sub-clause (a) above;
(d) before testing the confined space for entry into or work, the place shall be rendered safe by
washing or cleaning with neutralising agents; or purging with steam or inert gases and making
adequate forced ventilation arrangements or such measure which will render the confined space
safe;
(e) Shalt arrange to carry out such tests as are necessary for the purpose by a competent person
and ensure that the confined space is safe for the persons to enter or work. Such testing shall
be carried out as often as is necessary during the course of work to ensure its continued safety;
(f) shall arrange to educate and train the personnel who would be required to work in confined
spaces about the hazards involved in the work. He shall also keep in readiness the appropriate
and approved personal protective equipment including arrangements for, rescue resurrection
and first aid, and shall arrange supervision of the work at all times by a responsible and
knowledgeable person.
(g) The occupier shall maintain a log of all entry into or work in, confined spaces and such
record shall contain the details of persons assigned for the work, the location of the work and
such other details that would have a bearing on the log book so maintained shall be retained as
long as the concerned workers are in service and produces to the Inspector- cum-Facilitator
when demanded.
19. Maintenance work etc-
(1) All the work connected with the maintenance of plants and equipment including
cleaning of empty containers which have held hazardous substances used in the processes
covered in this Schedule, shall be carried out under• permit to work system' employing trained
personnel and under the supervision of responsible person, having knowledge of the hazards
and precautions required to deal with them.
(2) Maintenance work shall be carried out in such a manner that there is no risk to persons
in the vicinity or to persons who pass by. If necessary, the place of such work shall be cordoned
off or the presence of unconnected persons effectively controlled.
20. Permit to work system - The permit to work system shall inter-alia include the
observance of the following precautions while carrying out any specified work to be subjected
to the permit to work system -
(a) all work subject to the permit to work system shall be carried out under the supervision of
a Knowledgeable and responsible person;
(b) all parts of plant or machinery or equipment on which permit to work system is carried
out, shall remain isolated from other parts throughout the period of permit to work and the
place of work including the parts of plant, machinery shall be rendered safe by cleaning,
purging, washing, etc.;
(c) All work subject to the permit to work system shall have predetermined work
procedures which integrate safety with the work. Such procedures shall be reviewed whenever
any change occurs in material or equipment so that continued safety is ensured;
(d) persons who are assigned to carry out the permit to work system shall be physically fit
in all respects taking into consideration the demands and nature, of the work before entering
into the confined space. Such person shall be adequately informed about the correct work
procedures as well as the precautions to be observed while carrying out the permit to work
system;
(e) adequate rescue arrangements wherever considered necessary and adequate first aid,
rescue and resurrection arrangements shall be available in good working condition near the
place of work while carrying out the permit to work system, for use in emergency;
(f) appropriate and approved personal protective equipment shall be used while carrying
out the 'permit to work system';
(g) after completion of work subject to the 'permit to work system' the person responsible
shall remove all the equipment and tools and restore to the original condition so as to prevent
any danger while carrying out regular process.
21. Safety sampling personnel - The occupier shall ensure the safety of persons assigned
for collecting samples by instructing them on the safe procedures. Such personnel shall be
provided with proper and approved personal protective equipment, if required.
22. Ventilation - Adequate ventilation arrangements shall be provided and maintained at all
times in the process area where dangerous or toxic or flammable or explosive substances could
be evolved. These arrangements shall ensure that concentrations, which are either harmful or
could result in explosion, are not permitted to be built up in the work environment.
23. Procedures for meeting emergencies -
(1) The occupier of every factory carrying out the works covered in Appendix
(2) 'A', shall arrange to identify all types of possible emergencies that could occur in the
processes during the course of work or while carrying out maintenance work or repair work.
The emergencies so identified shall be reviewed every year.
(3) The occupier shall formulate a detailed plan to meet all such identified emergencies
including arrangements for summoning outside help for rescue and firefighting arrangements
for making available urgent medical facilities.
(4) The occupier shall send the list of emergencies and the details of procedures and plans
formulated to meet the emergencies, to the Chief Inspector-cum- Facilitator.
(5) The occupier shall arrange to install distinctive and recognisable warning arrangements to
caution all persons inside the plant as well as the neighbouring community, if necessary, to
enable evacuation of persons and to enable the observance of emergency procedures by the
persons who are assigned emergency duties. All concerned must be well informed about the
warning arrangements and their meaning. The arrangements must be checked for its
effectiveness every month.
(6) Alternate power supply arrangements shall be made and interlocked with the normal power
supply system so as to ensure constant supply of power to the facilities and equipment meant
for compliance with requirements of Paragraphs 10, 11, 12, 13,14, 18, 22, and this paragraph
of Part 11, Part 111, Part IV and Part V of this Schedule.
(7) The occupier shall arrange to suspend the further process work in a place where emergency
is established and shall forthwith evacuate all persons in that area except workers who have
been assigned emergency duties.
(8) All the employees of the factory shall be trained about the action to be taken by them
including evacuation procedures during emergencies.
(9) All emergency procedures must be rehearsed every three months and deficiencies, if any,
in the achievement of the objectives shall suitably be corrected.
(10) The occupier shall arrange to have ten percent of the workers trained in the use of First
Aid Fire Fighting appliances and in the rendering of specific hazards of the particular process.
(11) The occupier shall furnish immediately on request the specific chemical identity of the
hazardous substance to the treating physician where the information is needed to administer
proper emergency or first-aid treatment to exposed persons.
24. Danger due to effluents - (1) Adequate precautions shall be taken to prevent the mixing
of effluents from different processes and operations which may cause dangerous or poisonous
gases to be evolved.
(2) Effluents which contain or give rise in the presence of other effluents to poisonous gases
shall be provided with independent drainage systems to ensure that they may be trapped and
rendered safe.
PART- III
Fire and Explosion Risks
1. Sources of ignition including lighting installation. -
(1) No internal combustion engine and no electric motor or other electrical equipment, and
fittings and fixtures capable of generating sparks or otherwise causing combustion or any other
source of ignition or any naked light shall be installed or permitted to be in the process area
where there could be fire and explosion hazards.
(2) All hot exhaust pipes shall be installed outside a building and other hot pipes or hot surface
or surfaces likely to become hot shall be suitably protected.
(3) The classification of work areas in terms of its hazard potential and the selection of
electrical equipment or other equipment that could constitute a source of ignition shall be in
accordance with the respective Indian Standard.
[4) Where a flammable atmosphere may be prevalent or could occur, the soles of footwear
worn by workers shall have no metal on them, and the wheels of trucks or conveyors shall be
conductive type.
(5) All tools and appliances used for work in this area shall be of non-sparking type.
(6) Smoking in process areas where there are risks of fire and explosion shall be prohibited,
and warning notices in the language understood by majority of workers shall be posted in the
factory prohibiting smoking into specified areas.
2. Static Electricity -
(1) All machinery and plant, particularly, pipe lines and belt drives, on which static charge
is likely to accumulate, shall be effectively earthed. Receptacles for flammable liquids shall
have metallic connections to the earthed supply tanks to prevent statics parking. Where
necessary, humidity shall be regulated.
(2) Mobile tanker wagons shall be earthed during filling and discharge, and precautions shall
be taken to ensure that earthing is effective before such filling or discharge take place.
3. Lightning protection - Lightening protection arrangement shall be fitted where
necessary, and shall be maintained.
4. Process heating - The method of providing heat for a process likely to result in fire and
explosion shall be as safe as possible and where the use of naked flame is necessary, the plant
shall be so constructed as to prevent any escaping flammable gas, vapour, or dust coming into
contact with the flame, or exhaust gases, or other sources likely to cause ignition. Wherever
possible, the heating arrangement shall be automatically controlled at a pre-determined
temperature below the danger temperature.
5. Leakage of flammable liquids -
(1) Provision shall be made to confine by means of bund walls, dykes, sumps etc. Possible
leakages from storage vessels containing flammable liquids.
(2) Waste material in contact with flammable disposed off suitably under the supervision
responsible person. Substances shall be of knowledgeable and
(3) Adequate and suitable fire-fighting appliances shall be installed in the vicinity of such
vessels.
6. Safety valves - Every still and every closed vessel in which gas is evolved or into which
gas is passed, and in which the pressure is liable to rise above
the atmospheric pressure, shall have attached to it a pressure gauge, and a proper safety valve
or other equally efficient means to relieve the pressure. These appliances shall be maintained
in good condition.
7. Installation of pipe line etc. - All pipelines carrying flammable or explosive substances
shall be protected from mechanical damage and shall be examined by a responsible person
once a week to detect any deterioration or defects, or accumulation of flammable or explosive
substances, and record kept of any defects found and repairs made.
8. Firefighting systems -
(1) Every factory employing 250 or more persons and carrying out processes listed in Appendix
'A' shall provide -
(a) Trained and responsible firefighting squad so as to effectively handle the fire fighting and
lifesaving equipment in the event of fire or other emergency. Number of persons in this squad
will necessarily depend upon the size of risk involved, but in no case shall be less than 8 such
trained persons to be available at any time. The squad shall consist of watch & ward personnel,
fire pump man and departmental supervisors and operators trained in the operation of fire
&emergency services.
(b) Squad leaders shall preferably be trained in a recognised government institution and their
usefulness enhanced by providing residence on the premises.
(c) Squad personnel shall be provided with clothing and equipment including helmets, boots
and belts.
(2) A muster roll showing the duties allocated to each member of the squad shall be prepared
and copies supplied to each leader as well as displayed in prominent places so as to be easily
available for reference in case of emergency.
(3) The pump man shall be thoroughly conversant with the location of all appliances. He shall
be responsible for maintaining all firefighting equipment in proper working order. Any defect
coming to his notice shall be immediately be brought to the notice of squad leader.
(4) As far as is practicable, the fire pump room and the main gate(s) of the factory be connected
to all manufacturing or storing areas through telephone inter lined and placed in a convenient
location near such areas.
PART IV
Risks of Toxic Substances
1. Leakage -
(1) All plants shall be so designed and constructed as to prevent the escape of toxic substance.
Where necessary, separate buildings, rooms, or protective structures shall be used for the
dangerous stages of the process and buildings shall be so designed as to localise any escape of
toxic substances.
(2) Catch pits, bund walls, dykes, or other suitable safeguards shall be provided to restrict the
serious effects of such leakages. Catch pits shall be placed below joints in pipelines where there
is danger involved to maintenance and other workers from such leakage.
2. Drainage - Adequate drainage shall be provided and shall lead to collection tanks
specifically provided for this purpose wherein deleterious material shall be neutralised, treated
or otherwise rendered safe before it is discharged into public drains or sewers.
3. Covering of vessels -(1) Every fixed vessel or structure containing any toxic substance
and not so covered as to eliminate all reasonable risk of accidental contact of any portion of
the body of a worker, shall be so constructed as to avoid physical contact.
(2) Such vessel shall, unless its edge is at least 90 centimetres above the adjoining ground
or platform, be securely fenced to a height of at least 90 centimeters above such adjoining
ground or platform.
(3) Where such vessels adjoin and the space between them, clear of any surrounding brick
or other work is either less than 45 centimeters in width or is 45 or more centimeters in width,
but is not securely fenced on both sides to a height of at least 90 centimeters, secure barriers
shall be so placed as to prevent passage between them :
Provided that sub-paragraph (2) of this paragraph shall not apply to -
(a) saturators used in the manufacture of sulphate of ammonia; and
(b) That part of the sides of brine evaporating pans which require raking, drawing or filling.
4. Continuous exhaust arrangement -
(1) Any process evolving toxic vapour, gas, fume and substance shall have efficient
continuous exhaust draught. Such arrangement shall be interlocked in the process control
wherever possible.
(2) In the event of failure of continuous exhaust arrangement means shall be provided to
automatically stop the process.
5. Work Bench - All the work benches used in the processes involving the manipulation
of toxic substances, shall be graded properly and shall be made of smooth impervious surface
which shall be washed daily after the completion of work.
6. Waste disposal -
(1) There shall be provided a suitable receptacle made of non-absorbable material with a
tightly fitting cover for depositing waste material soiled with toxic substances and the contents
of such receptacle shall be destroyed by burning or using other suitable methods under the
supervision of a responsible person.
(2) During the course of manufacture, whenever any batch or intermediate products having
toxicity is rejected on considerations of quality, sufficient precautions shall be taken to render
them innocuous or otherwise treat them or inactivate them, before disposal.
(3) The empty containers of toxic substances shall be cleaned thoroughly before disposal
under the supervision of a responsible person.
PART- V
Special Provisions
1. Special precautions for Nitro or Amino Processes -
(1) Unless the crystallised nitro or amino substances or any of its liquor is broken or
agitated in a completely enclosed process so as not to give rise to dust or fume, such process
shall be carried on under an efficient exhaust draught or by adopting any other suitable means
in such a manner as to prevent the escape of dust or fume in the working atmosphere.
(2) No part of the plant or equipment or implements which was in contact with nitro or
amino compounds shall be repaired, or handled unless they have been emptied and thoroughly
cleaned and decontaminated.
(3) Filling of containers with nitro or amino compounds shall be done only by using a
suitable scoop to avoid physical contact and the drying of the containers in the store shall be
done in such a manner that the hot and contaminated air from the stove is not drawn into the
work room.
(4) Processes involving the steaming into or around any vessel containing nitro or amino
compounds or its raw materials shall be carried out in such a manner that the steam or vapour
is effectively prevented to be blown back into the working atmosphere.
(5) Suitable antidotes such as methylene blue injections shall always be available at
designated places of work for use during emergency involving the poisoning with nitro or
amino compounds.
2. Special precautions for• chrome processes -
(1) Grinding and sieving of raw materials in chrome processes shall be carried on in such
a manner and under such condition as to secure effective separation from any other processes
and under an efficient exhaust draught.
(2) There shall be washing facilities located very near to places where wet chrome
processes such as leaching, acidification, sulphate settling, evaporation, crystallisation,
centrifugation or packing are carried out, to enable quick washing of affected parts of body
with running water.
(3) Weekly inspection of hand and feet of all persons employed in chrome process shall be
done by a qualified nurse and record of such inspections shall be maintained in a form approved
by the Chief Inspector-cum-Facilitator.
(4) There shall be always available at designated places of work suitable ointment such as
glycerine, Vaseline, etc. And water proof plaster in a separate box readily accessible to the
workers so as to protect against perforation of nasal septum.
3. Special precautions for processes carried out in all glass vessels -
(1) Processes and chemical reactions such as manufacture of vinyl chloride, benzyl chloride
etc. Which are required to be carried out in all glass vessels shall have suitable means like
substantial wire mesh covering to protect persons working nearby in the event of breakage of
glass vessel.
(2) Any spillage or emission of vapour from the all-glass vessel due to breakage, shall be
immediately inactivated or rendered innocuous by suitable means such as dilution with water
or suitable solvents so as to avoid the risks of fire or explosion or health hazards.
4. Special precautions for processes involving chlorate manufacture -
(1) Crystallisation, grinding or packing of chlorate shall not be done in a place used for any
other purpose and such places shall have hard, smooth and impervious surface made of non-
combustible material. The place shall be thoroughly cleaned daily.
(2) The personal protective equipment likes overall, etc. Provided for the chlorate workers
shall not be taken from the place of work and they shall be thoroughly cleaned daily.
(3) Adequate quantity of water shall be available near the place of chlorate process for use
during fire emergency.
(4) Wooden vessels shall not be used for the crystallisation of chlorate or to contain
crystallised ground chlorate.
5. Special precautions in the use of plant and equipment made from reinforced plastics -
(1) All plant and equipment shall conform to appropriate Indian or any other National
Standard.
(2) Care shall be taken during storage, transport, handling and installation of plant and
equipment to avoid accidental damage.
(3) All plant and equipment shall be installed in such a way as to ensure that loads are
distributed as intended in design or as per the recommendations of the manufacture.
(4) All pipe work shall be supported so that total loads local to the branches on the vessel
or tank do not exceed their design values.
(5) After erection all plant and equipment shall be subjected to a pressure test followed by
a thorough examination by a competent person. The test and examination shall be as per
relevant Standard. A certificate of test and examination by a competent person shall be obtained
and kept available at site.
(6) All plant and equipment shall be subjected to periodical test and examination and record
maintained as per Paragraph 15 in Part 11 of this Schedule
(7) Plant and equipment during their use shall not be subjected to over filling or
overloading beyond rated capacity.
PART-VI
Medical Requirements
(1) Decontamination facilities - In all places where toxic substances are used in processes listed
in Appendix 'A' the following provisions shall be made to meet an emergency:
(a) fully equipped first aid box;
(b) readily accessible means of drenching with water persons, parts of body of persons, and
clothing of persons who have been contaminated with such toxic and corrosive substances, and
such means shall be as shown in the Table below: -
No of persons employed at any time No of drenching showers
Up to 50 persons 2
Between 51 to 100 3
101 to 200 3 + 1 for every 50 persons thereafter
201 to 400 5 + 1 for every 100 persons thereafter
401 and above 7 +1 for every 200 persons thereafter
(c) a sufficient number of eye wash bottles filled with distilled water or suitable liquid, kept in
boxes or cupboards conveniently situated and clearly indicated by a distinctive sign which shall
be visible at all times.
(2) Occupational health Centre - In all the factories carrying out processes covered in
Appendix 'A' there shall be provided and maintained in good order an occupational health
centre with facilities as per scale laid down hereunder
(1) For factories employing up to fifty workers -
(a) the services of a qualified medical practitioner shall be available on a retainer ship basis,
in his notified clinic near to the factory for seeking medical help during emergency. He will
also carry out the pre-employment and periodical medical examinations as stipulated in
paragraph 4 of this Part.
(b) A minimum of five persons trained in first aid procedures, amongst whom at least one
shall always be available during the working period.
(c) A fully equipped first aid box.
(2) For factories employing 51 to 200 workers -
(a) The occupational health centre shall have a room having a minimum floor area of 15 Sq.M,
with floors and walls made of smooth, hard and impervious surface and shall be adequately
illuminated, ventilated and equipped.
(b) A part-time Qualified Medical Practitioner will be in overall charge of the Centre who
shall visit the factory minimum twice in a week and whose services shall be readily available
during emergencies.
(c) There shall be one qualified and trained dresser-cum-compounder on duty throughout
the working period.
(d) A fully equipped first aid box.
(3) For factories employing above 200 workers -
(a) There shall be one full-time Qualified Medical Practitioner for factories employing up
to 500 workers and one more medical officer for every 1000 workers or part thereof.
(b) The occupational health centre in this case shall have a minimum of 2 rooms each
having a minimum floor area of 15 sq.m. with floors and walls made of smooth, hard and
impervious surface and shall be adequately illuminated, ventilated and equipped.
(c) There shall be one trained nurse, one dresser-cum-compounder and one sweeper-cum-
ward boy throughout the working period.
(d) The Occupational Health Centre in this case shall be suitably equipped to manage medical
emergencies.
3. Ambulance van -
(1) In every factory carrying out processes covered in Appendix 'A', there shall be provided
and maintained in good condition, a suitably constructed and fully equipped ambulance van as
per Appendix 'C' manned by a full-time driver-cum mechanic and a helper, trained in first aid
for the purposes of transportation of serious cases of accidents or sickness unless arrangements
for procuring such facility at short notice during emergencies have been made with the nearby
hospital or other places. The ambulance van shall not be used for any purpose other than the
purpose stipulated herein and will always be available near the Occupational Health Centre.
(2) The relaxation to procure Ambulance Van from nearby places provided for in sub para (1)
above will not be applicable to factories employing more than 500 workers.
4. Medical examination –
(1) Workers employed in processes covered in Appendix 'A' shall be medically
examined by Medical Officer in the following manner -
(i) Once before employment, to ascertain physical suitability of the person to do the particular
job;
(ii) Once in a period of 6 months, to ascertain the health status of the worker, and
(iii) The details of pre-employment and periodical medical examinations carried out as
aforesaid shall be recorded in the prescribed Form-40 and 44.
(2) Any finding of the Medical Officer revealing any abnormality or unsuitability of any
person employed in the process shall immediately be reported to the Medical officer who shall
in turn, examine the concerned workers and communicate his findings within 30 days. If the
Medical officer is of the opinion that the person so examined is required to be suspended from
the process for health protection he will direct the occupier accordingly, who shall not employ
the said worker in the same process. However, the person so suspended from the process shall
be provided with alternate placement facilities unless he is fully incapacitated in the opinion of
the Medical officer, in which case the person affected shall be suitably rehabilitated :
Provided that the Medical officer on his own may examine any other worker whom he feels
necessary to be examined for ascertaining the suitability of his employment in the process
covered in Appendix 'A' or for ascertaining the health status of any other worker and his opinion
shall be final.
(3) No person shall be newly appointed without the Certificate of Fitness granted by the
Medical Officer. If the Medical Officer declares a person unfit for being appointed to work in
the process covered in Appendix 'A', such person shall have a right of appeal to the Medical
officer, whose opinion shall be final in this regard.
(4) The worker suspended from the process owing to the circumstances covered in sub-
paragraph (2) shall be employed again in the same process only after obtaining the Fitness
Certificate from the Medical officer and after making entries to that effect in the health register.
PART VII
Additional Welfare Amenities
1. Washing facilities -
(1) There shall be provided and maintained in every factory for the use of all the workers taps
for washing, at the rate of one every 15 persons including liquid soap in a container with tilting
arrangements and nail brushes or other suitable means for effective cleaning. Such facilities
shall be conveniently accessible and shall be kept in a clean and hygienic condition.
(2) If washing facilities as required above are provided for women, such facilities shall be
separate for them and adequate privacy at all times shall be ensured in such facilities.
2. Mess room facilities -
(1) The occupier of all the factories carrying out processes covered in Appendix 'A' and
employing 50 workers or more, shall provide for all the workers working in a shift mess room
facilities which are well ventilated and provided with tables and sitting facilities along with the
provision of cold and hygienic drinking water facilities.
(2) Such facilities shall include suitable arrangements for cleaning and washing and shall
be maintained in a clean and hygienic condition.
3. Cloakroom facilities -
(1) The occupier of every factory carrying out any process covered in Appendix 'A' shall
provide for all the workers employed in the process cloak room facilities with lockers. Each
worker shall be provided with two lockers, one for work clothing and another separately for
personal clothing and the lockers should be such as to enable the keeping of the clothing in a
hanging position.
(2) The cloak room facilities provided in pursuance of sub-para (1) shall be located as far
as possible near to the facilities provided for washing in pursuance of para 1(1). If it is not
possible to locate the washing facilities the cloakroom facilities shall have adequate and
suitable arrangements for cleaning & washing.
4. Special bathing facilities -
(1) The occupier of any factory carrying out the process covered under Appendix 'B' shall
provide special bathing facilities for all the workers employed and such facilities shall be
provided at the rate of 1 for 25 workers or less workers than 25 workers, and shall be maintained
in a clean and hygienic condition.
(2) The occupier shall insist all the workers employed in the processes covered in Appendix
"B' to take bath after the completion of the day's or shift work using the bathing facilities so
provided and shall also effectively prevent such of those workers taking bath in any place other
than the bathing facilities.
(3) Notwithstanding anything contained in sub-para (1) above, the Chief Inspector-cum-
Facilitator may require in writing the occupier of any factory carrying out any other process
for which his opinion bathing facilities are essential from the health point of view, to provide
special bathing facilities.
PART VIII
1. Duties of workers -
(1) Every worker employed in the processes covered in Appendix 'A' and Appendix 'B'
shall not make safety device or appliance or any guarding or fencing arrangement, inoperative
or defective and shall report the defective condition of the aforesaid arrangements as soon as
he is aware of any such defect.
(2) Before commencing any work, all workers employed in processes covered in Appendix
'A' shall check their workplace as well as the machinery, equipment or appliance used in the
processes and report any mal- function or defect immediately to the supervisor or any
responsible person of the management.
(3) All workers shall co-operate in all respects with the management while carrying out
any work or any emergency duty assigned to them in pursuance of this schedule and shall
always use all the personal protective equipment issued to them in a careful manner.
(4) All workers employed in the processes covered in Appendix 'A' or Appendix 'B' shall
not smoke in the process area or storage area. If special facilities are provided by the
management only such facilities should be used.
(5) All workers employed in the processes covered in Appendix 'A' shall not remain an
unauthorised place or carry cut unauthorised work or improvise any arrangement or adopt short
out method or misuse any of the facilities provided in pursuance of the Schedule, in such a
manner as to cause risk to themselves as well as or to others employed.
(6) The workers shall not refuse undergoing medical examination as required under these rules.
PART IX
Restrictions on the employment of pregnant Women and Adolescent
(1) The Chief Inspector-cum-Facilitator may by an order in writing, restrict or prohibit the
employment of pregnant women and adolescent , in any of the processes covered in Appendix
'A' of this schedule on considerations of health and safety of women and young persons.
(2) Such persons who are restricted or prohibited from working in the process due to the
order issued in pursuance of sub-para (1) above shall be provided with alternate work which is
not detrimental to their health or safety.
PARTX
Exemptions
Power of exemption - The Union Territory Administration of Lakshadweep or subject to the
control of the Administration of Lakshadweep, the Chief Inspector-cum-Facilitator may
exempt from the compliance with any of the requirements of this Schedule partly or fully, any
factory carrying out processes covered in Appendix 'A', if it is clearly and satisfactorily
established by the occupier that the compliance with any of the requirement is not necessary to
ensure the safety and health of persons employed suitable and effective alternate arrangements
are available to any of the requirements covered in this schedule.