PROCESS OF EXTRACTING OILS AND FATS FROM VEGETABLE AND ANIMAL SOURCE IN
SOLVENT EXTRACTION PLANTS:
1. Definitions.—For the purposes of this Schedule—
(a) "Competent person" for the purpose of this Schedule shall be at least a Member of the
Institution of Engineers (India) or an Associate Member of the said Institution with 10
years experience in a responsible position as may be approved by the Chief Inspector-
cum- Facilitator:
Provided that a graduate in mechanical engineering or chemical engineering
technology with specialised knowledge of oils and fats and with a minimum experience
of 5 years in a solvent extraction plant shall also be considered to be a competent
person:
Provided further that the State Government may accept any other qualifications if
in its opinion they are equivalent to the qualifications aforesaid.
(b) "flame proof enclosure" as applied to electrical machinery or apparatus means an
enclosure that will withstand, when covers or other access doors are properly secured,
an internal explosion of the flammable gas or vapour which may enter or which may
originate inside the enclosure without suffering damage and without communicating
internal inflammation (or explosion) to the external flammable gas or vapour;
(c) "solvent" means an inflammable liquid such as pentane, hexane and heptane used for
the recovery of vegetable oils;
(d) "solvent extraction plant" means a plant in which the process of extracting oils and fats
from vegetable and animal sources by the use of solvents is carried on.
2. Location and layout.—(1) No solvent extraction plant shall be permitted to be constructed or
extended to within a distance of 30 meters from the nearest residential locality.
(2) A 1-5 metre high continuous wire fencing shall be provided around the solvent extraction
plant up to a minimum distance of 15 meters from the plant.
(3) No person shall be allowed to carry any matches or an open flame of fire inside the area
bounded by the fencing.
(4) Boiler houses and other buildings were open flame processes are carried on shall be
located at least 30 metres away from the solvent extraction plant.
(5) If godowns and preparatory process are at a distance of less than 30 meters from the
solvent extraction plant, these shall be at least 15 metres distant from the plant, and a
continuous barrier wall of non-combustible material 1.5 meters high shall be erected at
distance of not less than 15 meters from the solvent extraction plant so that it extends to
at a least 30 meters of vapour travel around its ends from the plant to the possible
sources of ignition.
3. Electrical installations.—(1) All electrical motors and wiring and either electrical equipment
installed or housed in a solvent extraction plant shall be of flame proof construction.
4. (2) All metal parts of the plant and building including various tanks and containers where
solvents are stored are present and all parts of electrical equipment not required to be
energised shall be properly bonded together and connected to earth so as to avoid accidental
rise in the electrical potential of such parts above the earth potential.
5. Restrictions on smoking.—Smoking shall be strictly prohibited within 15 meters distance from a
solvent extraction plant. For this purpose, "No Smoking" signs shall be permanently displayed
in the areas.
6. Precautions against friction.—(1) All tools and equipment including ladders, chains and other
lifting tackle required to be used in a solvent extraction plant shall be of non-sparking type.
(2) No machinery or equipment in a solvent extraction plant shall be belt driven.
(3) No person shall be allowed to enter and work in the solvent extraction plant if wearing
clothes made of nylon or such other fibre that can generate static electrical charge or
wearing footwear which is likely to cause sparks by friction.
7. Fire-fighting apparatus.—(1) Adequate number of portable fire extinguishers suitable for use
against flammable liquid fires shall be provided in the solvent extraction plant.
(2) An automatic water spray sprinkler system on a wet pipe or open-head deluge system
with sufficient supply of storage water shall be provided over the solvent extraction plant
and throughout the building housing such plant.
8. Precautions against power failure.—Provision shall be made for the automatic cutting off of
steam in the event of power failure and also for emergency overhead water-supply for feeding
water by gravity to condensers which shall come into play automatically with the power failure.
9. Magnetic separators.—Oil cake shall be fed to the extruder by a conveyor through a hopper
and a magnetic separator shall be provided to remove any pieces of iron during its transfer.
10. Venting.—(1) Tanks containing solvents shall be protected with emergency venting to relieve
excessive internal pressure in the event of fire.
(2) All emergency relief vents shall terminate at least 6 metres above the ground and be so
located that vapours will not re-enter the building in which the solvent extraction plant is
located.
11. Waste water.—Process waste water shall be passed through a flash evaporator to remove any
solvent before it is discharged into a sump which should be located within the fenced area but
not closer than eight metres to the fence.
12. Ventilation.—The solvent extraction plant shall be well ventilated and if the plant is housed in a
building, the building shall be provided with mechanical ventilation with provision for at least six
air changes per hour.
13. Housekeeping.—(1) Solvent shall not be stored in an area covered by a solvent extraction
plant except in small quantities which shall be stored in approved safety cans.
(2) Waste materials such as oily rags, other wastes and absorbents used to wipe off solvent
and paints and oils shall be deposited in approved containers and removed from the
premises at least once a day.
(3) Space within the solvent extraction plant and within 15 meters from the plant shall be
kept free from any combustible materials and any spills of oil or solvent, shall be cleaned
up immediately.
14. Examination and repairs.—(1) The solvent extraction plant shall be examined by the competent
person to determine any weakness or corrosion and wear once in every 12 months. Report of
such examination shall be supplied to the Inspector cum facilitator with his observation as to
whether or not the plant is in safe condition to work.
(2) No repairs shall be carried out to the machinery or plant except under the direct
supervision of the competent person.
(3) Facility shall be provided for purging the plant with inert gas before opening for cleaning
or repairs and before introducing solvent after repairs.
15. Operating Personnel.—The operation of the plant and machinery in the solvent extraction plant
shall be in the charge of such duly qualified and trained persons as are certified by the
competent person to be fit for the purpose and no other person shall be allowed to operate the
plant and machinery.
16. Employment of women and young persons.—No women or young person shall be employed in
the solvent extraction plant.
17. Vapour detection.—A suitable type of flame proof and portable combustible gas indicator shall
be provided and maintained in good working order and a Schedule routine sampling of
atmosphere at various locations approved by the Chief Inspector-cum- Facilitator shall be
drawn out and entered in a register maintained for the purpose.