The Occupational Safety, Health and Working Conditions (Jammu and Kashmir) Rules, 2026
Rule 56. Rules in respect of factory or class or description of factories under sub-section (1) of section 79
Text read by machine from the official scan
The Government or the Chief Inspectorcum-Facilitator may require for the purposes of the Code, submission of plans of any factory which was either in existence on the date of the commencement of these rules or which had not been constructed or extended since then. Such plans shall be drawn to scale showing: - a. the site of the factory and immediate surrounding including adjacent buildings and other structures, roads, drains, etc.; b. the plan, elevation and necessary cross-sections of the factory buildings indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire, and the position of the plant and machinery, aisles and passage ways; and c. such other particulars as the Government or the Chief Inspector-cumFacilitator, as the case may be, may require.