Contents of the OSH Rules (Jammu and Kashmir)

The Occupational Safety, Health and Working Conditions (Jammu and Kashmir) Rules, 2026

Rule 56. Rules in respect of factory or class or description of factories under sub-section (1) of section 79

Chapter IX — Special Provision for Contract Labour, Inter-State Migrant WorkerMade under The Occupational Safety, Health and Working Conditions Code, 2020S.O. 224, 12 Aug 2026

Text read by machine from the official scan

The Government or the Chief Inspectorcum-Facilitator may require for the purposes of the Code, submission of plans of any factory which was either in existence on the date of the commencement of these rules or which had not been constructed or extended since then. Such plans shall be drawn to scale showing: - a. the site of the factory and immediate surrounding including adjacent buildings and other structures, roads, drains, etc.; b. the plan, elevation and necessary cross-sections of the factory buildings indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire, and the position of the plant and machinery, aisles and passage ways; and c. such other particulars as the Government or the Chief Inspector-cumFacilitator, as the case may be, may require.

Source: The Occupational Safety, Health and Working Conditions (Jammu and Kashmir) Rules, 2026, S.O. 224 — the official copy of the notification, p. 31 of the PDF. Open our copy at p. 31 · official download · all sources

The official copy is a scan. This text was read by machine and only tidied by program, not checked page by page, so it will contain mistakes, including in numbers: the official PDF is the copy to rely on. The Forms are not reproduced here; read them in the PDF. Rule numbers the machine missed (36, 72, 77) stay inside the rule before them here.