The Occupational Safety, Health and Working Conditions (Jammu and Kashmir) Rules, 2026
Schedule G
Text read by machine from the official scan
Open in the official PDF (pp. 224–228)
Tables and forms lose their layout when extracted; the PDF is the authoritative version.
(See Rule 69 and Rule 70)
Section of Class
the
Code
of
empowering
grant
factory
of
exemption
91(1)(b)
Nature
exempted
work
of
Extent of Remarks
exemption
All
factories
Urgent repairs
Sections
25, 26 & 31
(i) No worker shall be
employed on such
repairs for more than
15 hours on any one
day, 39 hours during
any three consecutive
days, or 66 hours
during each period of
seven
days
consecutive
commencing
from
his
first
employment on such
repairs.
(ii) Within 24 hours of
the commencement
of the work, notice
shall be sent to the
Inspector describing
the nature of the
urgent repairs and
the period probably
required for their
completion.
(iii) Exemption from
the provisions
of
section 25 shall apply
only in the case of
adult male workers.
91(1)(b).
All
Work in the Sections
The limits of work
factories
machine shop,
25.26 &31 inclusive of overtime
the smithy or
shall not exceed
the foundry or
those mentioned in
in connection
section 91.
with the mill
gearing,
the
electric driving
r lighting
apparatus, the
mechanical or
electrical
91(1)(b)
factories
(a) Work in connection
do.
with lifts or the steam or
water pipes or pumps of
factory;
(b) Work of examining or
repairing any machinery
or other part of the plant
which is necessary for
carrying on work in the
factory;
(c) Work in boiler houses
engine rooms such as
lighting fires in order
generate gas preparatory
to the commencement of
regular work in the
factory
(a) Work performed by Sections
drivers
lighting,
25,26&
ventilating
and 31
humidifying
apparatus;
(b) Work performed by
fire pumpmen.
do.
91(1)(b)
Oil tank
Work performed
by Sections In the absence of a
workers connected with
25,26&
worker who has
pumping installations.
failed to report duty,
a shift worker shall
be allowed to work
the whole or of a
subsequent
shift
provided
that-
(i) the next shift of
the shift worker shall
not
commence
before a period of 16
hours has elapsed;
(ii) Within: 24 hours of
the commencement of
the subsequent shift,
notice shall be sent to
the Inspector describing
the circumstances under
which the worker
is
required to work in the
subsequent
shift;
(iii) The exemption will
be
restricted to only
male adult workers; and
(iv) The limits of work
inclusive
of
overtime
shall not exceed those
mentioned in section 91.
Public
hydroelectric
supply factories
Operation
and Sections do.
maintenance of prime 25 & 26
movers and auxiliaries,
transformers
and
switches.
Public electric Work of engine drivers do.
do.
assistants,
companies
generator attendants,
generating
oilers and greasers,
electricity from switch board operators
oil in internal and pumpmen.
combustion
engines
Electrical
transforming
factories
Distilleries
Sugar factories
Chemical
factories
Vegetable
factories
Ice factories
Work of operation and do.
maintenance of the
transforming
plant,
switches
and
synchronous
condensers.
Work on the extraction do.
of sugar from various
Sages, rementation a nd
juice
and
distillation of fermented
wash.
Extraction of the juice do.
from
the
clarification, evaporation
and boiling of the juice,
curing
the
massecuite,
and
bagging.
Work on the sulphur do.
burners,
chambers,
concentrators,
and
pumps;
roasting
furnaces;
manufacture
of hydrochloric and nitric
acid,
sulphates
sulphides,
superphosphates and
chlorides; and work on
the steam service.
Work
on refining,
do.
hydrogenation
bleaching,
filtering,
generation of hydrogen;
hydrogenating;
deodorizing processes;
compression of oxygen
and cylinder filling; and
work on the electrical
power plant.
Work on the engine and do.
do.
do.
do.
do.
do.
do.
Oil mills
Flour mills
Glass factories
Paper factories
Rubber
factories
Iron and steel
All factories
compressor drivers and
assistants and oilers.
All work.
Section
do.
All work.
Sections do.
25 and
(a) Work in attending to Sections do.
furnace;
25 & 26
(b) All
work and/ Section
processes from mixing of 25
batch to removal of the
manufactured glassware
from the lears.
(a) All work on paper Sections d
1aking machinery and 2!
on the generation and Sections
supply
of
power 25 & 26
connected therewith;
(b) Work on choppers,
digesters,
kneaders,
strainers and washers,
beaters, papermaking
machines,
pumping
plant reelers, cutters and
power plant.
tyre All work on curing Section
do.
process.
All work
on steel Sections
do.
furnaces.
25 & 26
Work on automatic Sections (1) The limits
equipment engaged in25,26&
galvanizing,
work
anodizing 29
inclusive of
and enamelling.
overtime
shall
not
exceed those
mentioned in
section 91.
(2) The
exemption
shall
be
granted only
in respect of