Cleaning or smoothing, roughening etc. of articles by a jet of sand, metal shot or grit or
other abrasive propelled by a blast of compressed air or steam
1. Definitions.- For the purposes of this Schedule,-
(i) "Blasting" means cleaning, smoothing, roughening, or removing of any part of the
surface of any article by the use as an abrasive of a jet of sand, metal shot, or grit
or other material, propelled by a blast of compressed air or steam;
(ii) "Blast enclosure" means a chamber, barrel, cabinet or any other enclosure
designed for the performance of blasting therein;
(iii) "Blasting chamber" means a blasting enclosure in which any person may enter at
any time in connection with any work or other-wise; and
(iv) "Cleaning of castings" where done as an incidental or supplemental process in
connection with the making of metal castings, means the freeing of the casting
from adherent sand or other substance and includes the removal of cores and the
general smoothing of a casting, but does not include the free treatment.
2. Prohibition of Sand Blasting.- Sand or any other substance containing free silica shall not
be introduced as an abrasive in to any blasting apparatus and shall not be used for blasting.
3. Precautions in connection with Blasting Operations.-
(1) Blasting to be done in blasting enclosure.- Blasting shall not be done except in a
blasting enclosure and no work, other than blasting and any work immediately incidental
thereto and clearing and repairing of the enclosure including the plant and appliances situated
therein, shall be performed in a blasting enclosure. Every door, aperture and joint of blasting
enclosure shall be kept closed and air-tight while blasting is being done therein.
(2) Maintenance of blasting enclosure.- Blasting enclosure shall always to be maintained in
good condition and effective measures shall be taken to prevent dust escaping from such
enclosures, and from apparatus connected therewith, into the air of any room.
(3) Provisions of separating apparatus.- There shall be provided and maintained for and in
connection with every blasting enclosure, efficient apparatus for separating so far as
practicable. Abrasive which has been used for blasting and which is to be used again as an
abrasive, from dust or particles of other materials arising from blasting and no such abrasive
shall be introduced into any blasting apparatus and used for blasting until it has been so
separated.
(4) Provision of ventilating plant.- (a) There shall be provided and maintained in connection
with every blasting enclosure efficient ventilating plant to extract, by exhaust draught
effected by mechanical means, dust produced in the enclosure. The dust extracted and
removed shall be disposed of by such method and in such a manner that it shall not escape
into the air of any room; and
(b) every other filtering or settling device situated in a room in which persons are employed,
other than persons attending to such bag or other filtering or settling device, shall be
completely separated from the general air of that room in an enclosure ventilated to the open
air.
(5) Operation of ventilating plant- The ventilating plant provided for the purpose of clause
(4) shall be kept in continuous operation whenever the blasting enclosure is in use whether or
not blasting is a actually taking place therein and in the case of blasting chamber, it shall be
in operation even when any person is inside the chamber for the purpose of cleaning or any
repair work.
4. Inspection and Examination.- (1) Every blasting enclosure shall be specially inspected by
a technical person, employed in the factory, at least once every week in which it is used for
blasting. Every blasting enclosure, the apparatus connected therewith and the ventilating
503
plant, shall be thoroughly examined and in the case of a ventilating plant tested by a
competent person at least once in six months.
(2) Particulars of the result of every such inspection, examination and test shall forthwith be
entered in a register which shall be kept in a register and shall be available for inspection by
any workman employed in or in connection with blasting in the factory. Any defect found on
any such inspection, examination or test shall be immediately reported by the person carrying
out the inspection, examination or test to the occupier, manager or, other appropriate person
and without prejudice to the foregoing requirements of this Schedule, shall be removed
without available delay.
5. Provisions of protective helmets, gauntlets and overalls.- (1) There shall be provided
and maintained for the use of all persons who are employed in a blasting chamber, whether in
blasting or any work connected therewith or in cleaning such a chamber, protective helmets
of National or International Standard and every such person shall wear the helmet provided
for his use whilst he is in the chamber and shall not remove it until he is outside the chamber.
(2) Each protective helmet shall carry a distinguishing mark indicating the person by whom it
is intended to be used and no person shall be allowed or required to wear a helmet not
carrying his mark or a helmet which has been worn by another person and has not since been
thoroughly disinfected.
(3) Each protective helmet when in use shall be supplied with clean and not unreasonably
cold air at a rate or not less than 0.17 cubic metres per minute.
(4) Suitable gauntlets and overalls shall be provided for the use of all persons while
performing blasting or assisting at blasting, and every such person shall while so engaged
wear the gauntlet and overall provided.
6. Precautions in connection with cleaning and other work.- (1) Where any person is
engaged upon cleaning of any blasting apparatus or blasting enclosure or of any apparatus of
ventilating plant connected therewith or the surroundings thereof or upon any other work in
connection with any blasting apparatus or blasting enclosure or with any apparatus or
ventilating plant connected therewith so that he is exposed to the risk of inhaling dust which
has arisen from blasting.
(2) In connection with any cleaning operation referred to in clause (5), and with the removal
of dust from filtering or setting devices all practicable measures shall be taken to dispose of
the dust in such a manner that it does not enter the air of any room. Vacuum cleaners shall be
provided and used wherever practicable for such cleaning operations.
7. Medical examination.- Every worker employed in the processes referred to in clause 1
shall be examined within 15 days of this employment. Such examination shall include tests
for lead in blood and urine, 'ALA' in urine, haemoglobin content, stippling of cells and
steadiness test.
8. Maintenance of vacuum cleaning plant.- Vacuum cleaning plant used for the purpose of
this Schedule shall be properly maintained.
9. Power to exempt or relax.- If the Chief Inspector-cum-Facilitator is satisfied that if any
factory or any class of factory, the use of sand or other substance containing free silica as an
abrasive in blasting is necessary for a particular manufacture or process (other than the
process incidental or supplemental to making of metal castings) and that the manufacture or
process cannot be carried on without the use of such abrasive or that owing to the special
conditions or special method of work or otherwise any requirement of this Schedule can be
suspended either temporarily or permanently, or can be relaxed without endangering the
health of the person employed or that application of any of such requirements is for any
reason impracticable or inappropriate, he may, with the previous sanction of the State
Government, by an order in writing exempt the said factory or class of factory from such
provisions of this Schedule, to such an extent and subject to such conditions and for such