Fee payable for original licence and for Renewal of licence for Electricity Generating,
Transforming Section / Factory.
Total installed Generating Transforming
Generating Capacity Station (Including
in Conversion Station)
K.W.
KW Rs. Rs.
Not more than 50 1500 900
-do- 100 2700 1500
-do- 150 3900 2700
-do- 300 4500 4200
-do- 500 6000 4500
-do- 750 9000 6750
-do- 1000 12000 9000
-do- 2500 21000 12900
-do- 5000 27000 15000
-do- 10000 33000 18000
-do- 25000 45000 27000
-do- 50000 72000 36000
-do- 75000 91200 45000
-do- 100000 117000 54000
-do- 150000 144000 72000
-do- 200000 180000 108000
-do- 300000 234000 144000
-do- 300000 288000 180000
(b) All Transmitting Centre (Factory)- 32,500/-
Explanations. -
1. Total rated Capacity(power) of machinery of plants means:-
(a) In case of machinery of plants which generates or provides power, the rated
generating or producing capacity (power) expressed in Horse Power.
(b) In case of any prime-mover the raised capacity expressed in Horse Power.
(c) In case of any other plant or machinery the power expressed in Horse Power
required K.W. to operate the machine at its normal rated capacities.
(d) In case of electric furnaces, ovens or like plants, the consumption thereof for its rated
or a normal operation converted in terms of Horse Power.
(e) In case of furnaces, ovens, and like plants fired by coal, oil, gas or any other fuel the
equivalent electric power converted into Horse Power.
(f) In case of Steam Boilers and Steam Generators, the rated capacity of the Boiler
expressed in terms of Horse Power.
For the Boiler used for supply of process steam evaporation capacity of 34.5 lbs. of water per
hour would be taken as equivalent to Horse Power.
2. Where a factory has its own electric power generating plants to the amount of fees payable
for the whole factory shall be the amount obtained by adding the amount payable for the
factory excluding the power generating plant calculated as per Schedule "A" and that payable
for the power generating unit as per Schedule "B" respectively.
Where a factory has its own transforming station the amount of fees payable shall be
calculated in a like manner.
Where a factory has its own generating station as well as transforming station for drawing
additional power from an external source, the fee payable shall be the amount obtained by
adding the fees which would have been payable for the Generating Station, Transforming
Station and the rest of the factory, respectively as if they were separate factories.
3. In a steam power station, the capacities of the Generating units only would be taken in to
account and not of the Boilers.
But if any such power station contains any boiler for supply of process steam, such boiler or
part of boiler shall be separately counted for calculating the installed Horse Power.
4. In the calculation of Installed capacity all spare stand by and emergency machines and plants
shall be taken into account, and shall be deemed to be working units and they shall not be
excluded merely on the ground that they were only stand by, spare or emergency units, which
are to be operated only on special occasions and in emergencies.
5. Where any machine is driven by an electric motor or any other prime-mover the rated
capacity in Horse Power of the said motor shall be deemed to be the rated capacity of the
machine, and the capacity of the motor or the prime-mover and that of the driven machine
shall not be counted separately.
6. Where an electricity generating factory includes a transmitting of converting station or plant
meant for recovering transforming,converting or transmitting of electric power supplied from
a source outside the Generating Station and which is not meant for transforming, converting
or transmitting power generated in the Generating Station itself the fees payable shall be the
total of the fees payable by the Generating and Transforming (including converting) Station,
calculated separately in accordance with the rate of fees prescribed under sub-head (a) and
by the Transmitting Station under-sub-head (b),